Customer ↔ Supplier Requirements

Requirements shouldn't get lost between companies.

ShareReqs gives customers and suppliers one shared workspace to review requirements, clarify deviations, agree baselines and control every subsequent change.

Built for engineering teams working across company boundaries.

Falcon Power Unit · Baseline 1.2

REQ-012Accepted

The enclosure shall meet IP65 ingress protection.

Comply

REQ-018Clarification required

Operating temperature range: -20°C to +65°C.

Clarification required

REQ-024Deviation proposed

Interface connector shall be M12, 8-pin, A-coded.

Partially comply

REQ-037Accepted

The unit shall operate from 18 VDC to 32 VDC.

Comply

Requirements cross company boundaries. Your tools often don't.

Specifications are sent as spreadsheets, documents and PDFs. Responses arrive by email. Clarifications happen in meetings. New revisions are exchanged as attachments. Months later, determining exactly what the customer requested and what the supplier accepted can become unnecessarily difficult.

Scattered communication

Requirements, responses and clarifications live in different places.

Version uncertainty

Teams lose time establishing which revision is current.

Unclear agreement

"Discussed" is not the same as "agreed."

Uncontrolled change

A requirement can change after work has already started.

ShareReqs creates a shared, traceable interface between customer and supplier.

Signature concept

Know exactly what was agreed.

When customer and supplier reach agreement, create a baseline that preserves the accepted requirements and their revisions. Future changes are proposed, reviewed and accepted without losing the history of the original agreement.

Without an agreed baseline, there's no way to define when a requirement is actually closed — only negotiations that repeat.

A shared history instead of competing memories.

  1. REQ-037 v1

  2. Supplier requests clarification

  3. REQ-037 v2

  4. Supplier proposes deviation

  5. REQ-037 v3

  6. Customer accepts

  7. Supplier accepts

  8. BASELINE 1.0 — AGREED

  9. Customer proposes change

  10. REQ-037 v4 — PENDING

From specification to agreed baseline

01

Share

Import or create requirements

Bring the requirements into a shared project and invite the other organization.

02

Respond

Review requirement by requirement

Comply, partially comply, cannot comply, or request clarification — response by response.

03

Clarify

Resolve questions and deviations in context

Keep discussion attached to the requirement it affects.

04

Agree

Create an accepted baseline

Establish the version both sides are working against.

05

Change

Control what happens next

Proposed changes create a new traceable revision without rewriting history.

Replace document ping-pong with a shared process

Before ShareReqs

  • Customer_Requirements_v7_FINAL.xlsx
  • Email clarifications
  • Meeting notes
  • Supplier response spreadsheet
  • Revised PDF
  • "Which version did we quote against?"
  • Manual change tracking

With ShareReqs

  • One shared requirements workspace
  • Requirement-level responses
  • Contextual clarification
  • Explicit status
  • Accepted baselines
  • Version history
  • Controlled change
  • Audit trail

Excel isn't the problem — uncontrolled exchange across organizations is.

Built for the customer–supplier interface

Customer → Supplier

Issue technical requirements, collect responses and manage deviations before and during development.

Supplier → Customer

Record compliance, assumptions and exceptions against the requirements you received.

Supplier → Sub-supplier

Flow requirements down the supply chain while maintaining visibility of what has been agreed.

Requirements management without the handover gap

Falcon Power Unit

Customer Northstar Systems

Supplier Apex Electronics

Baseline 1.2 — Accepted
IDRequirementStatus
REQ-039Enclosure shall be sealed to IP65.Accepted
REQ-042The unit shall operate from 18 VDC to 32 VDC.Accepted
REQ-044Firmware shall be updatable over CAN bus.Pending
REQ-047MTBF shall be ≥ 50,000 hours.Deviation proposed

REQ-042

The unit shall operate from 18 VDC to 32 VDC.

Supplier Comply

Status Accepted

History

  1. Customer created v1
  2. Supplier requested clarification
  3. Customer revised to v2
  4. Supplier accepted
  5. Included in Baseline 1.2

Project, company and requirement names are illustrative.

Help shape ShareReqs

ShareReqs isn't built yet. Before it is, we want to understand how engineering teams like yours actually exchange and agree requirements with customers or suppliers today — and whether a shared workspace would genuinely help. If this sounds like your problem, telling us here is exactly how we'll decide whether to build it.

We've temporarily paused new submissions while we sort out some things on our end. Check back soon.

Frequently asked questions

Is ShareReqs a requirements-management tool?

ShareReqs focuses specifically on requirements exchanged between customers and suppliers: review, clarification, agreement, baselines and change control.

Does ShareReqs replace our existing requirements tool?

It doesn't have to. ShareReqs is designed as the shared layer between organizations. Future integrations and exchange formats can connect it to existing engineering workflows.

Can suppliers participate without buying their own subscription?

Our goal is to make external collaboration frictionless. Invited customer and supplier participants should be able to collaborate without every external user needing to purchase a separate seat.

Can we import Excel requirements?

Excel import is planned as part of the intended workflow, since many customer–supplier exchanges begin with spreadsheets.

Is our data ours, or ShareReqs'?

Yours. While we build ShareReqs, we're evaluating the export formats that make the most sense — CSV, Excel and ReqIF among them — so your requirements, agreements and history stay portable and you're never locked into the tool.

When will ShareReqs be available?

ShareReqs is currently being validated with engineering teams. Request early access if you'd like to participate in the pilot.